gnu: dbus: Re-introduce extended test timeout.
This reverses removing this phase in
a24562af52
, which is still needed by some
slower machines.
* gnu/packages/glib.scm (glib)[arguments]: Add 'increase-test-timeout
phase to ensure tests which don't hang also don't timeout.
master
parent
0e2251fcf8
commit
7b7bc91c3d
|
@ -204,6 +204,12 @@ shared NFS home directories.")
|
|||
#:configure-flags '("-Dman=true")
|
||||
#:phases
|
||||
(modify-phases %standard-phases
|
||||
;; Needed to pass the test phase on slower ARM and i686 machines.
|
||||
(add-after 'unpack 'increase-test-timeout
|
||||
(lambda _
|
||||
(substitute* "meson.build"
|
||||
(("(test_timeout.*) = ([[:digit:]]+)" all first second)
|
||||
(string-append first " = " second "0")))))
|
||||
(add-after 'unpack 'disable-failing-tests
|
||||
(lambda _
|
||||
(with-directory-excursion "glib/tests"
|
||||
|
|
Reference in New Issue